Send Message

Beijing Hownew Energy Technology Group Co., Ltd vincent@hownewenergy.com 86-10-53681027

Beijing Hownew Energy Technology Group Co., Ltd Company Profile
Cases
Home > Cases >
Company Cases About 1.Rupsha, Bangladesh:2 * 800MW Gas Turbine Combined Cycle Power Plant Project

1.Rupsha, Bangladesh:2 * 800MW Gas Turbine Combined Cycle Power Plant Project

2022-05-04
Latest company cases about 1.Rupsha, Bangladesh:2 * 800MW Gas Turbine Combined Cycle Power Plant Project

1. Rupsha, Bangladesh:2 * 800MW Gas Turbine Combined Cycle Power Plant Project

  • The owner of this project is Northwest Power Generation Company Limited (NWPGCL) in Bangladesh. We supply pipes, fittings, and piping. The product meets the technical requirements of the owner in Bangladesh for the main equipment and auxiliary equipment.
  • The supplied products include main steam pipelines, high-temperature reheat steam pipelines, low-temperature reheat steam pipelines, OTC steam pipelines, bypass pipelines, drainage pipelines, instrument conduits, etc.
  • The required materials are: A335 P91, 12CrlMoVG, A691 2-1/4Cr CL22, A312TP321H。

 

latest company case about 1.Rupsha, Bangladesh:2 * 800MW Gas Turbine Combined Cycle Power Plant Project  0latest company case about 1.Rupsha, Bangladesh:2 * 800MW Gas Turbine Combined Cycle Power Plant Project  1

Events
Contacts
Contacts: Mr. Vincent
Fax: 86-10-53681027
Contact Now
Mail Us